User Tools

Site Tools


visual3d:documentation:pipeline:metric_commands:metric_time_between_events

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
visual3d:documentation:pipeline:metric_commands:metric_time_between_events [2025/09/19 13:30] – [Metric Time Between Events] wikisysopvisual3d:documentation:pipeline:metric_commands:metric_time_between_events [2025/09/19 13:36] (current) wikisysop
Line 8: Line 8:
  
 The command can be found in the **Pipeline Workshop** under **Metric**. The command can be found in the **Pipeline Workshop** under **Metric**.
-==== Metric_Time_Between_Events Command Details ==== 
  
-Below are the details for this command:+====Pipeline Command==== 
 +The command syntax is as follows: 
 +<code> 
 +Metric_Time_Between_Events 
 +/RESULT_METRIC_NAME= 
 +! /RESULT_METRIC_FOLDER=PROCESSED 
 +/EVENT_SEQUENCE= 
 +/EXCLUDE_EVENTS= 
 +! /SCALE_FACTOR=1 
 +! /GENERATE_MEAN_AND_STDDEV=TRUE 
 +! /APPEND_TO_EXISTING_VALUES=FALSE 
 +
 +</code> 
 + 
 +====Command Parameters==== 
 + 
 +The following table shows the command parameters seen above and their descriptions:
  
 |**Metric_Time_Between_Events**                                                                                                                                                              | |**Metric_Time_Between_Events**                                                                                                                                                              |
Line 20: Line 35:
 |**! /Append to Existing Values=FALSE**                                                               |(True or False)Append this list of metrics to an existing metric of the same result name| |**! /Append to Existing Values=FALSE**                                                               |(True or False)Append this list of metrics to an existing metric of the same result name|
  
-\\+====Dialog==== 
 + 
 +The command can be edited in a text editor or in a dialog form. To edit in the dialog pop up form either click on the **Edit** button in the pipeline workshop or double-click on the pipeline command. The dialog is shown below. 
 + 
 +{{:TimeBetweenEventsDlg.png}} 
 + 
 + 
 +The dialog box allows you to assign values to the command parameters outlined above. 
 + 
 +====Examples==== 
 In this example, consider the metric **Right_Terminal_Double_Limb_Support** which is the time between **LHS** and **RTO**. In this example, consider the metric **Right_Terminal_Double_Limb_Support** which is the time between **LHS** and **RTO**.
  
Line 34: Line 59:
 </code> </code>
  
-Below is the dialog that pops up when pipeline selection is edited by double clicking with the left mouse button. 
  
-{{:TimeBetweenEventsDlg.png}} 
  
 **Note: Event_Sequence** - It is important to note that this command assumes that the events are specified in the correct order chronologically. **Note: Event_Sequence** - It is important to note that this command assumes that the events are specified in the correct order chronologically.
visual3d/documentation/pipeline/metric_commands/metric_time_between_events.1758288612.txt.gz · Last modified: 2025/09/19 13:30 by wikisysop