visual3d:documentation:pipeline:metric_commands:metric_time_of_global_maximum_from_event
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
visual3d:documentation:pipeline:metric_commands:metric_time_of_global_maximum_from_event [2024/06/18 13:32] – sgranger | visual3d:documentation:pipeline:metric_commands:metric_time_of_global_maximum_from_event [2025/09/19 15:15] (current) – wikisysop | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | Event_Labels are defined by the C3D format. Event_Labels exist only at Motion Capture frames (e.g. at Point Rate or video rate). For model based kinematic and kinetic calculations this is fine, because these signals only exist at Motion Capture frames. | + | ====== Metric Time of Global Maximum from Event ====== |
+ | ====Overview==== | ||
+ | The **Metric Time of Global Maximum from Event** command can be used to record | ||
- | For measures of timing that involve signals that are at **ANALOG** rate (e.g. Force Platform data) the motion capture rate (or point rate) isn't sufficient. | + | ====Pipeline Command==== |
- | In Version 5 a series of metric commands were introduced to identify the time of a threshold crossing or maximum at the analog rate. | + | The command syntax is as follows: |
- | This page details the command **Metric_Time_Of_Global_Maximum_From_Event** that will calculate the Global Maximum timing from an Event at the analog rate. | + | < |
- | + | Metric_Time_Of_Global_Maximum_From_Event | |
- | {{MetricTimeofGlobalMaxfromEvent.png}} | + | ! / |
- | + | ! / | |
- | **Metric_Time_Of_Global_Maximum_From_Event** | + | ! / |
- | /RESULT_EVENT_NAME= | + | ! /RESULT_COMPONENTS=ALL |
! / | ! / | ||
- | ! / | ||
! / | ! / | ||
+ | ! / | ||
! / | ! / | ||
! / | ! / | ||
Line 24: | Line 26: | ||
! / | ! / | ||
! / | ! / | ||
- | ! /SELECT_X= | + | ! /THRESHOLD= |
- | ! /SELECT_Y= | + | ; |
- | ! /SELECT_Z= | + | </code> |
- | ! /SELECT_RESIDUAL= | + | |
- | ! /START_AT_EVENT= | + | ====Command Parameters==== |
- | ! /END_AT_EVENT= | + | |
- | **;** | + | The following table shows the command parameters seen above and their descriptions: |
+ | |**/RESULT_METRIC_TIME=** |Time of minimum from event. | ||
+ | |**/RESULT_METRIC_VALUE=** |Value of minimum after event. | ||
+ | |**/RESULT_FOLDER=** |Name of folder designated for results. | ||
+ | |**/RESULT_COMPONENTS=** |Components to be included in results. | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**THRESHOLD** | ||
+ | |||
+ | |||
+ | ====Dialog==== | ||
+ | |||
+ | The command can be edited in a text editor or in a dialog form. To edit in the dialog pop up form either click on the **Edit** button in the pipeline workshop or double-click on the pipeline command. The dialog is shown below. | ||
+ | |||
+ | {{: | ||
+ | |||
+ | |||
+ | The dialog box allows you to assign values to the command parameters outlined above. | ||
+ | |||
+ | ====Notes==== | ||
+ | Event_Labels are defined by the C3D format. Event_Labels exist only at Motion Capture frames (e.g. at Point Rate or video rate). For model based kinematic and kinetic calculations this is fine, because these signals only exist at Motion Capture frames. | ||
+ | |||
+ | For measures of timing that involve signals that are at **ANALOG** rate (e.g. Force Platform data) the motion capture rate (or point rate) isn't sufficient. | ||
+ | |||
+ | In Version 5 a series of metric commands were introduced to identify the time of a threshold crossing or maximum at the analog rate. | ||
+ | |||
+ | This page details the command **Metric_Time_Of_Global_Maximum_From_Event** that will calculate the Global Maximum timing from an Event at the analog rate. | ||
+ | ====Examples==== | ||
visual3d/documentation/pipeline/metric_commands/metric_time_of_global_maximum_from_event.1718717526.txt.gz · Last modified: 2024/06/18 13:32 by sgranger