visual3d:documentation:pipeline:metric_commands:metric_time_of_threshold_from_event
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
visual3d:documentation:pipeline:metric_commands:metric_time_of_threshold_from_event [2024/07/03 17:29] – removed sgranger | visual3d:documentation:pipeline:metric_commands:metric_time_of_threshold_from_event [2025/09/22 18:05] (current) – [Examples] wikisysop | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | ====== Metric Time of Threshold from Event ====== | ||
+ | ====Overview==== | ||
+ | The **Metric Time of Threshold from Event** command can be used to record the time it takes for a signal to reach a threshold, like a joint angle reaching 90 degrees, in relation to a defined event. The command can be found in the **Pipeline Workshop** under **Metric**. | ||
+ | |||
+ | ====Pipeline Command==== | ||
+ | |||
+ | The command syntax is as follows: | ||
+ | |||
+ | < | ||
+ | Metric_Time_Of_Threshold_From_Event | ||
+ | ! / | ||
+ | ! / | ||
+ | ! / | ||
+ | ! /THRESHOLD= | ||
+ | ! / | ||
+ | ! / | ||
+ | ! / | ||
+ | ! / | ||
+ | ! / | ||
+ | ! / | ||
+ | ! / | ||
+ | ! / | ||
+ | ! / | ||
+ | ! / | ||
+ | ! / | ||
+ | ! / | ||
+ | ! / | ||
+ | ! / | ||
+ | ! / | ||
+ | ! / | ||
+ | ! / | ||
+ | ! / | ||
+ | ! / | ||
+ | ; | ||
+ | </ | ||
+ | |||
+ | ====Command Parameters==== | ||
+ | |||
+ | The following table shows the command parameters seen above and their descriptions: | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**THRESHOLD** | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**/ | ||
+ | |**ON_ASCENT** | ||
+ | |**ON_DESCENT** | ||
+ | |**FRAME_WINDOW** | ||
+ | |**ENSURE_FRAMES_BEFORE** | ||
+ | |**ENSURE_FRAMES_AFTER** | ||
+ | |||
+ | |||
+ | ====Dialog==== | ||
+ | |||
+ | The command can be edited in a text editor or in a dialog form. To edit in the dialog pop up form either click on the **Edit** button in the pipeline workshop or double-click on the pipeline command. The dialog is shown below. | ||
+ | |||
+ | {{: | ||
+ | |||
+ | |||
+ | The dialog box allows you to assign values to the command parameters outlined above. | ||
+ | |||
+ | ====Notes==== | ||
+ | |||
+ | Event_Labels are defined by the c3d format. Event_Labels exist only at Motion Capture frames (e.g. at Point Rate). For model based kinematic and kinetic calculations this is fine, because these signals only exist at Motion Capture frames. | ||
+ | |||
+ | For measures of timing that involve signals that are at ANALOG rate (e.g. Force Platform data) the motion capture rate isn't sufficient. | ||
+ | |||
+ | In Version 5 a series of metric commands were introduced to identify the time of a threshold crossing or maximum at the analog rate. | ||
+ | |||
+ | ====Examples==== | ||
+ | |||
visual3d/documentation/pipeline/metric_commands/metric_time_of_threshold_from_event.1720027746.txt.gz · Last modified: 2024/07/03 17:29 by sgranger