User Tools

Site Tools


visual3d:getting_started:testing_setup_checklist

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
visual3d:getting_started:testing_setup_checklist [2024/07/17 15:43] – removed sgrangervisual3d:getting_started:testing_setup_checklist [2024/07/26 14:32] (current) wikisysop
Line 1: Line 1:
 +====== Testing Setup Checklist ======
 +
 +When completing process oriented tasks, checklists are important part of the process. A thorough explanation of the benefits of checklists can be fount in [[http://gawande.com/the-checklist-manifesto|The Checklist Manifesto]].
 +
 +There are many crucial steps in collecting "routine" motion capture data.
 +
 +The following checklist is a starting point from which Motion Capture Laboratories can build their own.
 +
 +We encourage users to contribute to this list by sending additional tasks to support@has-motion.ca.
 +
 +===== Before Patient's Arrival =====
 +
 +====  1. Turn on ALL systems ====
 +
 +====  2. Verify Position and Orientation ====
 + 
 + 2.1 Verify the position and orientation of Motion Capture Cameras\\
 + 2.2 Verify the position and orientation of Force Platforms\\
 + 2.3 Verify the position and orientation of Force Structures\\
 + 2.4 Verify the position and orientation of Obstacles or Environment objects\\
 + 
 +====  3. Perform System Calibration ====
 +
 + 3.1 Perform static and/or dynamic calibrations of data collection devices\\
 + 3.2 Verify results against the Standards developed/referenced by your laboratory\\
 + 
 +====  4. Verify the protocol being used for the session ====
 +
 + 4.1 Verify the experimental protocol for the current data collection session\\
 + 
 +====  5. Set appropriate system settings ====
 +
 + 5.1 As per experimental protocol, set and verify system settings
 +  * e.g. sampling rates (synchronise), marker thresholds, ranges, triggers etc.\\
 +
 +====  6. Zero Force Plates and Perform CalTester test ====
 +
 + 6.1 Perform Caltester test at a minimum of 2 locations on each force platform\\
 + 6.2 Verify against prior laboratory results\\
 + 
 +====  7. Prepare necessary markers and supplies ====
 +
 +===== Patient's Arrival =====
 +
 +====  8. Obtain informed consent ====
 +
 +====  9. Record subject details ====
 +
 + 9.1 Insure that there are no contraindications for the patient completing the data collection\\
 +  * This may include data collection done via questionnaires or measurements\\
 +  * If data collection includes patient questionnaires check to make sure that they have been completed correctly\\
 +
 +====  10. Apply markers as per experimental protocol ====
 +
 + 10.1 Take a set of digital pictures of the subject for post-hoc review of the marker placement\\
 +
 +====  11. Record static calibration trial ====
 +
 + 11.1 Ensure all markers are visible\\
 + 
 +====  12. Verify recorded marker set ====
 +
 + 12.1 Verify recorded marker set by launching Visual3D, creating model, and applying model template appropriate for the protocol\\
 + 
 +====  13. Remove anatomical markers ====
 +
 + 13.1 If necessary, remove anatomical markers not needed for tracking in motion trials\\
 + 
 +====  14. Verify tracking using Real time ====
 +
 + 14.1 If you switch to the real time mode in Visual3D, you can verify that the tracking markers assigned to each segment are appropriate, and that the force vectors make intuitive sense\\
 + 
 +====  15. Record dynamic trials ====
 +
 +====  16. Verify force platform assignments ====
 +
 + 16.1 Load data into Visual3D, assign movement trials to model, and verify force platform assignments\\
 + 16.2 Remove assignments to partial force contacts\\
 + 16.3 Remove assignments when two segments are in contact with the same platform\\
 + 
 +====  17. Execute pipeline for creating event labels ====
 +
 + 17.1 Verify that these event labels make intuitive sense. If not, data collection should be repeated\\
 +  
 +===== After Patient Leaves =====
 +
 +====  18. Clean up work station ====
 +
 +====  19. Execute pipeline for processing ====
 +
 +====  20. Load Report Template ====
 +
 +====  21. Verify the report ====
 +
 +
  
visual3d/getting_started/testing_setup_checklist.1721230997.txt.gz · Last modified: 2024/07/17 15:43 by sgranger