caltester:caltesterplus:tutorials:force_platform_jig
Force Platform Jig
When defining a jig, the data collection procedure is the same as the data collection procedure to locate the force platform corners (explained below):
Instructions to Collect Data Trials (click to expand)
In order to use the CalTesterPlus program you need a set of properly collected data for each force platform you wish to calibrate. To collect a useful static trial for CalTester follow the following process. - Set up your capture volume making sure that all force platforms and cameras are in the positions that they will remain in for following data collections. - Place the CalTester base plate on the force platform before you begining the collecting the trial. - Zero the force platform so that it will not record the force produced by the CalTester base. - Begin the trial with the CalTester Rod on the CalTester base plate OFF the force platform. - Press down firmly on the Rod with a load of at least 200 N. - Keep the Rod aligned vertically and motionless during the trial. - The trial needs to be at least 1 second long. - There should be a minimum of three trial collected per force platform. Ideally there should be 8 or more, with at least one near each corner of the force platform and one near the center of the force platform. |
Defining a Jig (click to expand)
Locating the Force Plate with a Jig (click to expand)
caltester/caltesterplus/tutorials/force_platform_jig.txt · Last modified: 2024/07/17 11:44 by sgranger